{"id":1664,"date":"2021-06-14T08:59:39","date_gmt":"2021-06-14T06:59:39","guid":{"rendered":"https:\/\/ssa-architektur.com\/fti-copy\/"},"modified":"2026-03-27T11:01:29","modified_gmt":"2026-03-27T10:01:29","slug":"spreekarree","status":"publish","type":"post","link":"https:\/\/ssa-architektur.com\/en\/spreekarree\/","title":{"rendered":"Spreekarree"},"content":{"rendered":"<h4>Spreekarree<\/h4>\n<h5>Feasibility studies for potential tenants, Am Postbahnhof, M\u00fchlenstra\u00dfe, Berlin -<\/h5>\n<h5>The floor areas of the high-rise building were redesigned for various future tenants based on detailed spatial needs and the corresponding costs assessed. To meet these requirements, the upper floors were spatially reorganized and aligned with the tenant\u2019s specifications.<\/h5>\n<h5><\/h5>","protected":false},"excerpt":{"rendered":"<p>Spreekarree Mietinteressentenplanungen, Am Postbahnhof, M\u00fchlenstra\u00dfe, Berlin &#8211; Die Fl\u00e4chen des Hochhauses wurden f\u00fcr verschiedene, zuk\u00fcnftige Nutzer anhand detaillierter Raumprogramme umgeplant und die Umbaukosten bewertet. F\u00fcr die Interessen wurden die Obergeschosse r\u00e4umlich neu organisiert und entsprechend der Anforderungen des Mieters abgestimmt.<\/p>","protected":false},"author":1,"featured_media":1667,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1664","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-allgemein"],"acf":[],"_links":{"self":[{"href":"https:\/\/ssa-architektur.com\/en\/wp-json\/wp\/v2\/posts\/1664","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ssa-architektur.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ssa-architektur.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ssa-architektur.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ssa-architektur.com\/en\/wp-json\/wp\/v2\/comments?post=1664"}],"version-history":[{"count":4,"href":"https:\/\/ssa-architektur.com\/en\/wp-json\/wp\/v2\/posts\/1664\/revisions"}],"predecessor-version":[{"id":1670,"href":"https:\/\/ssa-architektur.com\/en\/wp-json\/wp\/v2\/posts\/1664\/revisions\/1670"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ssa-architektur.com\/en\/wp-json\/wp\/v2\/media\/1667"}],"wp:attachment":[{"href":"https:\/\/ssa-architektur.com\/en\/wp-json\/wp\/v2\/media?parent=1664"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ssa-architektur.com\/en\/wp-json\/wp\/v2\/categories?post=1664"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ssa-architektur.com\/en\/wp-json\/wp\/v2\/tags?post=1664"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}